Operating 2 submersible pumps for Ghazieh Municipality:
1- 100Hp with 450 meters depth
2: 125Hp with 1043 distance between solar panels and the pump
Hybrid Solar System with High-Voltage Batteries
Jieh Marina Resort
1- 330KW On-Grid solar system operating with utility grid and diesel generators.
2- Saving up to 70% of the consumption leading to a reduction of 310 tons of CO2 annually.
Broumana lightning solution
TSC Mall-Jnah
Saving up to 49% in total energy. Turning off 2*500KVA generators out of 4
Variable frequency drive (VFD)
The VFD is used to eliminate motor starting current or what is called in-rush current to avoid generator cut-off
Variable frequency drive (VFD)
The VFD is used to eliminate motor starting current or what is called in-rush current to avoid generator cut-off
Automatic power factor correction board
This panel board adjusts the power factor of the factory and injects the needed reactive power in order to maintain a unity power factor near to 1.
This panel board offers cleaner and more efficient electrical network
PLC controlled ATS
Used for load shedding and sharing according to the real time consumption and load priorities to optimize generators efficiency and improve overall electrical network
Paralleling Gen-set 4 generators
500KVA, 400KVA, 300KVA, 150KVA
this panel board optimizes the generator efficiency in which only the needed generator/s will operate
1- saves diesel 2- less effort for switching generators 3- no electricity cut-off
Paralleling Gen-set 4 generators
500KVA, 400KVA, 300KVA, 150KVA
this panel board optimizes the generator efficiency in which only the needed generator/s will operate
1- saves diesel 2- less effort for switching generators 3- no electricity cut-off
Paralleling Gen-set 4 generators
500KVA, 400KVA, 300KVA, 150KVA
this panel board optimizes the generator efficiency in which only the needed generator/s will operate
1- saves diesel 2- less effort for switching generators 3- no electricity cut-off
Ghazieh Mosque
50KW Hybrid Solar System equipped with a high-voltage Weco battery bank
Jwayya Hospital
100 KW solar power installation complemented by a 2x50KWh storage system using Weco high voltage batteries.East-west topology alongside the traditional south orientation
Time Square-Tyre Microgrid
Powering the center through an independent solar PV system with storage battery banks. The 700KW solar system is operating stand-alone with backup generator and wind turbines without relying on the utility grid
Time Square-Tyre Microgrid
Powering the center through an independent solar PV system with storage battery banks. The 700KW solar system is operating stand-alone with backup generator and wind turbines without relying on the utility grid
Time Square-Tyre Microgrid
Powering the center through an independent solar PV system with storage battery banks. The 700KW solar system is operating stand-alone with backup generator and wind turbines without relying on the utility grid
Time Square-Tyre Microgrid
Powering the center through an independent solar PV system with storage battery banks. The 700KW solar system is operating stand-alone with backup generator and wind turbines without relying on the utility grid